
CHAPTER 6
Data Management
63
Tap the icon to go up one level in the job levels. The top level is the Memory level, where
physical memory devices can be selected. You can select:
• With Hardware Versions 1 – 3:
– Internal Disk
– SD-Card (if a card is inserted in the SD slot)
– CF-Card (if a card is inserted in the CF slot)
• With Hardware Version 4:
– Internal Disk
– SD-Card B (if a card is inserted in the bottom SD slot)
– SD-Card T (if a card is inserted in the top SD slot)
– USB-Mem (if a memory stick is inserted in the USB Standard A socket)
If Multi User is enabled (see section 8.1.6), then each user can access data on any of the
devices. However, a user cannot see or access jobs for other users.
To go down one level (that is, exit the Memory level), you tap the job name (INTERNAL DISK\
in this case) and select Open from the drop-down list – or you simply tap the Memory icon
next to INTERNAL DISK\.
Tap the icon to create a new job folder. The first job folder name will be ‘JOB 01’,
subsequent job folders will be labelled ‘JOB 02’, ‘JOB 03’, etc. You can rename the job folder
name by tapping on the name and selecting Rename from the drop-down list. Use the keyboard
to key in a new name – accept by tapping on the Enter key .
To go down one level (open a job), you tap the job name in the list and select Open from the
drop-down list – or you simply tap the Job icon to the left of the job name.
You can move a job/project (and its content) to another job by tapping the job name/project
name and selecting Cut from the drop-down list. Then navigate to the job you want as the new
holder of the moved job/project and tap the Paste icon , or navigate to the level above and
tap the job name and select Paste from the drop-down list.
In order to copy a job/project, do as described above, but use Copy instead of Cut from the
drop-down list.
Select Delete from the drop-down list in order to delete the job/project and all of its contents.
You can select more than one job/project for Copy, Cut or Delete by tapping and holding the
stylus on a job/project name and then dragging the stylus up or down to select other jobs/projects.
6.2 Selecting Default Measurement Job/Path
Tap the icon to select the current job as the default measurement job, where all projects
will be saved when you press the Save pushbutton. The job name, followed by the current
project name, will appear in the topmost line in the status area to confirm which job you have
selected.
Kommentare zu diesen Handbüchern